- Integrated Marine Systems did a major refurbishment of the refrigeration system in 2013 in Port Townsend, WA.
- Mike upgraded hold plate freezer system with all new hydraulic pumps and motors.
- Mike upgraded the system in 2019 with a new Isuzu auxiliary engine to run the hydraulic system as a backup the engine.
- Hold has a 16,000 pound capacity for freezing seafood at sea
Frozen-at-sea and dip-glazed Coho Salmon in the freezer hold
Salmon being off loaded from the freezer hold.